Placeholder · replace with site photoSafety is a system, not a slogan.
DGMS-aligned HSE on every site, every shift, every blast.
lost-time injuries on RVAP-1: 98,814 m³ of hard rock on a live expressway, 2023–25.
- 01Framework
A documented HSE system aligned with DGMS guidelines and each client’s EHS protocol.
- 02On every shift
Toolbox talks, pre-shift briefings and mandatory PPE.
- 03Every blast
Certified blasters, designed charges and vibration monitoring on sensitive corridors.
- 04Environment
Dust suppression, water mist, noise control, Stage IV/V machines and re-vegetation.
- 05Statutory
PF, ESIC, Labour Welfare and Pollution Control Board compliance in all six states.
Don’t take our word. Read it.
RVAP-1 Zero-LTI confirmation from client
PDF · available on request until the scan is uploaded
HSE policy (signed)
PDF · available on request until the scan is uploaded
DGMS compliance records
PDF · available on request until the scan is uploaded
Blaster certifications
PDF · available on request until the scan is uploaded
Training and toolbox-talk registers
PDF · available on request until the scan is uploaded
PF and ESIC registrations
PDF · available on request until the scan is uploaded