ANIL MINCONMINING · INFRA
Request a quote
Site crew member in hard hat and high-visibility vestPlaceholder · replace with site photo

Safety is a system, not a slogan.

DGMS-aligned HSE on every site, every shift, every blast.

Zero

lost-time injuries on RVAP-1: 98,814 m³ of hard rock on a live expressway, 2023–25.

DGMSAligned framework
100%Certified blasters
How it works
  • 01
    Framework

    A documented HSE system aligned with DGMS guidelines and each client’s EHS protocol.

  • 02
    On every shift

    Toolbox talks, pre-shift briefings and mandatory PPE.

  • 03
    Every blast

    Certified blasters, designed charges and vibration monitoring on sensitive corridors.

  • 04
    Environment

    Dust suppression, water mist, noise control, Stage IV/V machines and re-vegetation.

  • 05
    Statutory

    PF, ESIC, Labour Welfare and Pollution Control Board compliance in all six states.

Evidence

Don’t take our word. Read it.

RVAP-1 Zero-LTI confirmation from client

PDF · available on request until the scan is uploaded

Request

HSE policy (signed)

PDF · available on request until the scan is uploaded

Request

DGMS compliance records

PDF · available on request until the scan is uploaded

Request

Blaster certifications

PDF · available on request until the scan is uploaded

Request

Training and toolbox-talk registers

PDF · available on request until the scan is uploaded

Request

PF and ESIC registrations

PDF · available on request until the scan is uploaded

Request
To doUpload the client’s Zero-LTI confirmation letter for RVAP-1. This is the single most persuasive document on the site.

Got rock to move? Let’s talk.

An engineer replies within 48 hours.

Request a quote
Call WhatsApp