Start a project.
Three quick steps. An engineer replies within 48 hours.
Before you ask.
What is the typical timeline to mobilise on a new site?
AMPL's self-owned heavy fleet and standing mining-engineer-led teams mean we typically mobilise within 7–14 days of contract award and statutory clearance, faster than sub-contractor-dependent competitors who must first arrange hired equipment.
Which states and industries do you currently operate in?
AMPL is active across Rajasthan (HQ), Madhya Pradesh, Maharashtra, Andhra Pradesh, Odisha and Delhi-NCR — serving highways & expressways, railways, thermal power, cement, steel, airports and public-sector mining clients.
How does AMPL manage safety on live, high-traffic corridors?
Every blast is designed and supervised by certified blasters under a DGMS-aligned HSE framework, with vibration monitoring, controlled charge design and daily toolbox talks. This discipline delivered a Zero Lost-Time-Injury record on the RVAP-1 Expressway — a live-corridor hard-rock package.
Do you sub-contract equipment, or is the fleet self-owned?
100% self-owned. Our 30+ unit fleet — TATA Hitachi excavators, Atlas Copco crawler drills and hydraulic rock breakers — eliminates sub-contractor risk and hired-equipment downtime on every shift, on every site.
What size of contract does AMPL typically take on?
Our landmark portfolio spans ₹2.68 Cr to ₹27 Cr per engagement, from single-season quarrying contracts to multi-year expressway and thermal-power packages — with a cumulative project value of ₹75.78 Cr across 8 flagship engagements.